Shen, T., Tuo, X.-G., Liu, Y., & Lu, J. (2026). Three-component Parallel and Synchronous Seismic Data Acquisition Based on Time-division Sampling System. Journal of Vibration Testing and System Dynamics, 1(2), 135-141. https://doi.org/10.5890/JVTSD.2017.06.002